2020 NEC CMP-15 Rightsizing Concepts

Loading
loading...

Landing page for CMP-15 “Rightsizing” Discussion Group

 

Response for use by Steve Lipster (Updated Wednesday, November 29)

Google Document: Click here

PDF Word Document: CMP – 15 TG 2 Rightsizing Discussion Group Action on Article 517 PI

 


CMP-15: Article 517 PI (Link to CMP15 Technical Committee)

Code-Making Panel 15 (NEC-P15)

Principal Votes: (15)

Intertek Testing Services | R/T

American Society of Healthcare Engineering | User

Institute of Electrical and Electronic Engineers | User

NFPA Healthcare Secti0n | User

International Association of Electrical Inspectors | Enforcement

Edison Electric Institute | Utility

Applied Research/Testing Laboratory | R/T

International Alliance of Theatrical Stage Employees | Labor

International Brotherhood of Electrical Workers | Labor

The Aluminum Association, Inc. | Manufacturer

National Electrical Manufacturers Association | Manufacturer

Independent Electrical Contractors, Inc. | Installer/Maintainer

National Electrical Contractors Association | Installer/Maintainer

US Institute for Theatre Technology, Inc. | Manufacturer

International Association of Electrical Inspectors | Enforcement, Voting Alternate

70_A2019_NEC_P15_FD_PISubmittals-2

CMP-15 TG 2 Workflow v1 110517 Populated (1)

CSA-Groups-CEC-Section-8-Circuit-loading-and-demand-factors

NFPA 2020 Public Input Mike Anthony Standards Michigan File 16-102

 CMP-15 Update from Steve Lipster 12 November 2017

CMP-15 Update from Steve Lipster 12 November 2017 Second Meeting Report

CMP – 15 TG 2 Rightsizing Discussion Group Action on Article 517 PI.docx (Draft panel responses)

(Updated Wednesday, November 22)

Jason’s Memorandum (1)

Jason’s Monograph

Mazzetti Plug Process Loads Report

NREL End Use Load study

LBNL Hospital End Use Load research

 

Layout mode
Predefined Skins
Custom Colors
Choose your skin color
Patterns Background
Images Background
Skip to content