Rightsizing Electrical Power Systems
Catalyzed by the University of Michigan Business Operations, the 2014 NEC was revised to permit “rightsized” lighting supply circuits; saving 10’s of millions of dollars annually for the education industry and others. Doing the same for feeders and branch circuits faces headwind from vertical incumbents described in our ABOUT. 2026 NEC Second Draft ballots will be discussed today at 15:00 UTC
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed