Landing page for CMP-15 “Rightsizing” Discussion Group
Response for use by Steve Lipster (Updated Wednesday, November 29)
Google Document: Click here
PDF Word Document: CMP – 15 TG 2 Rightsizing Discussion Group Action on Article 517 PI
CMP-15: Article 517 PI (Link to CMP15 Technical Committee)
Code-Making Panel 15 (NEC-P15)
Principal Votes: (15)
Intertek Testing Services | R/T
American Society of Healthcare Engineering | User
Institute of Electrical and Electronic Engineers | User
NFPA Healthcare Secti0n | User
International Association of Electrical Inspectors | Enforcement
Edison Electric Institute | Utility
Applied Research/Testing Laboratory | R/T
International Alliance of Theatrical Stage Employees | Labor
International Brotherhood of Electrical Workers | Labor
The Aluminum Association, Inc. | Manufacturer
National Electrical Manufacturers Association | Manufacturer
Independent Electrical Contractors, Inc. | Installer/Maintainer
National Electrical Contractors Association | Installer/Maintainer
US Institute for Theatre Technology, Inc. | Manufacturer
International Association of Electrical Inspectors | Enforcement, Voting Alternate
70_A2019_NEC_P15_FD_PISubmittals-2
CMP-15 TG 2 Workflow v1 110517 Populated (1)
CSA-Groups-CEC-Section-8-Circuit-loading-and-demand-factors
NFPA 2020 Public Input Mike Anthony Standards Michigan File 16-102
CMP-15 Update from Steve Lipster 12 November 2017
CMP-15 Update from Steve Lipster 12 November 2017 Second Meeting Report
CMP – 15 TG 2 Rightsizing Discussion Group Action on Article 517 PI.docx (Draft panel responses)
(Updated Wednesday, November 22)
Mazzetti Plug Process Loads Report
LBNL Hospital End Use Load research