Master Format

Loading
loading...

https://en.wikipedia.org/wiki/MasterFormat

 

PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP

  • Division 00 — Procurement and Contracting Requirements

SPECIFICATIONS GROUP

General Requirements Subgroup

Facility Construction Subgroup

  • Division 02 — Existing Conditions
  • Division 03 — Concrete
  • Division 04 — Masonry
  • Division 05 — Metals
  • Division 06 — Wood, Plastics, and Composites
  • Division 07 — Thermal and Moisture Protection
  • Division 08 — Openings
  • Division 09 — Finishes
  • Division 10 — Specialties
  • Division 11 — Equipment
  • Division 12 — Furnishings
  • Division 13 — Special Construction
  • Division 14 — Conveying Equipment

Facility Services Subgroup:

  • Division 21 — Fire Suppression
  • Division 22 — Plumbing
  • Division 23 — Heating, Ventilating, and Air Conditioning (HVAC)
  • Division 25 — Integrated Automation
  • Division 26 — ElectricalUniversity of Michigan
  • Division 27 — Communications
  • Division 28 — Electronic Safety and Security

Site and Infrastructure Subgroup:

  • Division 31 — Earthwork
  • Division 32 — Exterior Improvements
  • Division 33 — Utilities
  • Division 34 — Transportation
  • Division 35 — Waterway and Marine Construction

Process Equipment Subgroup:

  • Division 40 — Process Interconnections
  • Division 41 — Material Processing and Handling Equipment
  • Division 42 — Process Heating, Cooling, and Drying Equipment
  • Division 43 — Process Gas and Liquid Handling, Purification and Storage Equipment
  • Division 44 — Pollution and Waste Control Equipment
  • Division 45 — Industry-Specific Manufacturing Equipment
  • Division 46 — Water and Wastewater Equipment
  • Division 48 — Electrical Power Generation

 

Layout mode
Predefined Skins
Custom Colors
Choose your skin color
Patterns Background
Images Background
Skip to content