ALWAYS OPEN

Ice Cream at the Rock

The Dairy Store was founded in 1913 and has since offered a variety of dairy products, including ice cream, cheese, and milk, produced by the university's Department of Food Science and Human Nutrition.

May 10, 2024

Watersport

Today at 15:00 UTC we update our understanding of best practice catalogs for outdoor and indoor watersport. Water chemistry, illumination, air quality and diving apparatus present challenges.

May 10, 2024

$21 Million Swimming & Diving Complex

The University maintains four swimming pools. The Aquatic Center features a 50-meter Olympic pool with diving platforms and an outdoor 25yd x 25m pool equipped with heating and cooling systems for year-round pool temperature comfort.  

May 10, 2024

Water and Electricity

Educational settlements present one of the largest installed bases of artificially created bodies of water; the most abundance resource on earth.  These bodies vary in size, purpose, and design but are all created by human intervention to serve specific needs, whether practical, recreational, or aesthetic.  Safe and sustainable management of them depend on electrotechnologies governed by the National Electrical Code, now open for public consultation until August 24, 2024. 

May 10, 2024

Quadrivium: Spring

Educational settlements are the closest many people come to feel at home in beautiful surroundings. The catalog that informs the safety and sustainability of these "cities-within-cities" changes 100 to 1000 times per day. By design titles are unstable, time-sensitive and copyright protected. We explore the action continuously; assign priorities, then schedule a separate teleconference to formulate responses to public consultations. Daily colloquia topics appear on our CALENDAR.

May 10, 2024

Swimming, Water Polo and Diving Lighting

Athletic programs form a large part of the brand identity and community spirit for most educational institutions.   Our focus has been on technology standards that govern the safety, performance and sustainability of these enterprises; electro-technology in particular. 

May 10, 2024

2028 National Electrical Safety Code

This title sets the standard of care for construction, operation and maintenance of power and telecommunication infrastructure on the supply side of the point of common coupling. It is the first title to reach for when disasters happen; with most public utilities bound to its best practice assertions by statute. Proposals for changes to appear in 2028 Edition will be received until 15 May 2024.

May 10, 2024

Electrical Resource Adequacy

Link to the April 25th Open Meeting. Previous discussions linked here center on supply, transmission and distribution reliability. Our interest lies in closing a technical gap that exists upstream from the building service point and downstream from the utility supply point. Some, not all of it, can be accomplished with titles in the IEEE catalog. Given the strength of vertical incumbents in the electric power domain, it is time to expand reliability concepts into the ASHRAE, NFPA and ICC catalogs

May 10, 2024

NESC & NEC Cross-Code Correlation

Workspace for drafting a detailed response to this 2018 statement. Open public consultation on the 2028 revision to the IEEE National Electrical Safety Code is very compressed -- only 90 days are open for a standard that is revised every 5 years. That's wrong -- and we told them so -- but we will roll with it and do the best we can to key in as many proposals before the May 15th deadline.

May 10, 2024
Layout mode
Predefined Skins
Custom Colors
Choose your skin color
Patterns Background
Images Background
Skip to content