- 0101.September.Friday
- 0202.September.Saturday
- 0303.September.Sunday
- 0404.September.Monday
- 0505.September.Tuesday
Building "Backup" Electric Power Systems
You are welcomed to join our review of backup power systems (customer-level). Although the term “backup” is not used in the codes and standards that govern electrical power safety and reliability, “backup” is a term of art widely used in design and field practice. Use the login credentials at the upper right of our home page.
https://standardsmichigan.com/backup-power-systems/
https://twitter.com/GretaBucyte/status/1699002002095722790?s=20

We’re “organized” but not too organized; like the bookseller who knows where every book can be found.
at a conference where you don’t have to present
— Peyman Milanfar (@docmilanfar) April 4, 2025
#AcademicChatter #AcademicTwitter
Academics be like 👇 pic.twitter.com/6cpVEw3PVS
— Reviewer 2 (@GrumpyReviewer2) April 2, 2024