John A. Paulson School of Engineering and Applied Sciences

Loading
loading...

John A. Paulson School of Engineering and Applied Sciences

February 8, 2024
[email protected]

2022 IRS 990 Filing: President And Fellows Of Harvard College

NACUBO-TIAA Study of Endowments

The University continues its  expansion in Allston, Massachusetts. The Harvard Business School and many of the university’s athletics facilities, including Harvard Stadium, are located on a 358-acre (145 ha) campus in Allston, a Boston neighborhood across the Charles River from the Cambridge campus. The John W. Weeks Bridge, a pedestrian bridge over the Charles River, connects the two campuses. Intending a major expansion, Harvard now owns more land in Allston than it does in Cambridge.

A ten-year plan calls for 1.4 million square feet (130,000 square meters) of new construction and 500,000 square feet (50,000 square meters) of renovations, including new and renovated buildings at Harvard Business School; a hotel and conference center; a multipurpose institutional building; renovations to graduate student housing and to Harvard Stadium; new athletic facilities; new laboratories and classrooms for the John A. Paulson School of Engineering and Applied Sciences; expansion of the Harvard Education Portal; and a district energy facility.

Allston Planning and Development

Harvard Research Summary 2023:

  • Alleviating depression with yoga
  • Using Machine Learning to Listen to Whales
  • Considering the genetics of musical ability

“Taking charge: Black electoral success and the redefinition of American politics”

Layout mode
Predefined Skins
Custom Colors
Choose your skin color
Patterns Background
Images Background
Skip to content