Emergency and Standby Power Systems

"Backup power" to elevator systems appears in several standards and varies according to jurisdiction.

Loading
loading...

Emergency and Standby Power Systems

March 26, 2024
[email protected]

Sporty weather season in the United States inspires a revisit of best practice for designing, building and maintaining the systems that provide limited electricity when the primary source fails. We have been active in the development of this and related titles for decades and have presented several proposals to the technical committee. Public response on the Second Draft of the 2025 revision will be received until March 27, 2024.

Electrical building, World’s Columbian Exposition, Chicago (1892)

FREE ACCESS to the 2022 Edition of NFPA 110 Standard for Emergency and Standby Power Systems

The scope of NFPA 110 and NFPA 111 are close coupled  and summarized below:

NFPA 110 Standard for Emergency and Standby Power Systems. This standard contains requirements covering the performance of emergency and standby power systems providing an alternate source of electrical power to loads in buildings and facilities in the event that the primary power source fails.

NFPA 111 Stored Electrical Energy for Emergency and Standby Power Systems. This standard shall cover performance requirements for stored electrical energy systems providing an alternate source of electrical power in buildings and facilities in the event that the normal electrical power source fails.

FIRST DRAFT AGENDA | August 2022

Public comment on the First Draft of the 2025 Edition will be received until May 31, 2023.  

We have advocated in this standard since 1996 and still use the original University of Michigan Workspace; though those workspaces must be upgraded to the new Google Sites during 2021.  We provide a link to the Standards Michigan Workspace and invite you to join any of our electrical colloquia which are hosted jointly with the IEEE Education & Healthcare Facilities Committee four times per month in European and American time zones.  See our CALENDAR for the next online meeting; open to everyone.

Issue: [96-04]

Category: Electrical, Risk

Contact: Mike Anthony, Robert Arno, Neal Dowling, Jim Harvey, Robert Schuerger, Mike Hiler

More

ITM of Emergency Power Systems

Planning for Higher Education Journal: Revisiting the Campus Power Dilemma: A Case Study

Tom is a long-time colleague and friend so Mike happily posts his content:

454c656374726f746563686e6f6c6f6779

Layout mode
Predefined Skins
Custom Colors
Choose your skin color
Patterns Background
Images Background
Skip to content