8990 Grand River Ave, Detroit

Loading
loading...

8990 Grand River Ave, Detroit

June 11, 2025
mike@standardsmichigan.com
,
No Comments

Homepage

Audio Standards

June 11, 2025
mike@standardsmichigan.com
,
No Comments

“A Dance to the Music of Time” 1640 Nicolas Poussin

 

 

“The voice of the intellect is a soft one,

but it does not rest until it has gained a hearing.”

— Sigmund Freud

 

The education industry provides a large market for occupancy classes — athletic stadiums, student assembly spaces, performance theaters, large lecture halls– that depend upon effective audio systems*.   To an unexpected degree the structural engineering, specification of materials and electrical system design and operation is informed by acoustical considerations.  So does the integration of fire safety and mass notification systems into normal state enterprises so it is wise to follow and, ideally, participate in leading practice discovery and promulgation of audio standards.

The Audio Engineering Society — one of the first names in this space — has a due process platform that welcomes public participation.   All of its standards open for public comment completed their revision cycle mid-November as can be seen on its standards development landing page below:

AES Standards Development

Note that AES permits access to those revision even after the comment deadline.  You are encouraged to communicate directly with the Direct communication with the standards staff at Audio Engineering Society International Headquarters, 551 Fifth Avenue, Suite 1225, New York NY 10176,  Tel: +1 212 661 8528

We keep the AES suite on the standing agenda of our periodic Lively Arts teleconference.  See our CALENDAR for the next online meeting.

This facility class is one of most complex occupancy classes in education facilities industry so we also collaborate with experts active in the IEEE Education & Healthcare Facilities Committee. Much of the AES suite references, and borrows from, International Electrotechnical Commission system integration and interoperability standards.   The IEEE E&H committee meets online again four times monthly in European and American time zones.  The meeting dates are available on the IEEE E&H website

Media production audio visual

Issue: [19-23]

Category: Electrical, Academic,  Athletics, Fire Safety, Public Safety, #WiseCampus

Contact: Mike Anthony, Jim Harvey

*Mass notification systems are governed by NFPA 72 and, while life safety wiring is separate from other wiring, the management of these systems involve coordination between workgroups with different business objectives and training.


LEARN MORE:

Archive / Audio Engineering Society

 

Amphitheaters

June 11, 2025
mike@standardsmichigan.com
, , ,
No Comments

“Panoramic View of the Greek Amphitheatre at Syracuse” 18th Century Abraham Louis Rodolphe Ducros

From from time to time — particularly in the months of fairer weather, when many events are hosted outdoors — we break form from the grind of responding to c0nsultations to simply enjoy these spaces  See our CALENDAR for our periodic Lively c0lloquia when we drill down into technical specifics.

서울대학교

University of Melbourne (Architect rendering of project in process)

Furman University

High Point University

George Fox University Oregon

Globe Theater / Southern Utah University

Point Loma Nazarene University

Augusta University / Georgia

Singapore Management University

Swarthmore College

Silliman University Amphitheater / The Phillippines

University of Colorado

South Dakota State University

University of Mary Washington / Virginia

California State University San Marcos

Universidade do Estado do Rio de Janeiro

Clemson University

University of Virginia

College of Idaho Centennial Amphitheater

Texas Woman’s University

Swarthmore College

Pomona College

Oakland University Meadowbrook Theater / Rochester, Michigan

More coming


LEARN MORE:

Standing Agenda / Event Standards

 

Underground Electrotechnology

June 11, 2025
mike@standardsmichigan.com

No Comments

Best practice literature to be covered in our 11 AM session today are listed below.  These codes and standards ensure safety, reliability, and compliance for underground electrical and telecommunications installations:

2028 National Electrical Safety Code

  • National Electrical Code (NEC), NFPA 70
    • Relevance: The NEC, published by the National Fire Protection Association, is the primary standard for safe electrical installations in the U.S. Articles 300 (Wiring Methods), 310 (Conductors for General Wiring), and 230 (Services) cover underground wiring, including burial depths, conduit requirements, and direct-burial cables like Type UF and USE-2. For example, NEC 300.5 specifies minimum cover depths (e.g., 24 inches for direct-burial cables, 18 inches for PVC conduit).
    • Key Aspects: Rules for conductor protection, grounding, GFCI requirements, and conduit types (e.g., Schedule 80 PVC). Adopted by most U.S. jurisdictions with local amendments.

ANSI/TIA-568 Series (Commercial Building Telecommunications Cabling Standards)

  • Relevance: Governs low-voltage telecommunications cabling, including underground installations. TIA-568.2-D (Balanced Twisted-Pair) and TIA-568.3-D (Optical Fiber) specify performance requirements for cables like Cat6 and fiber optics, including maximum distances (e.g., 100 meters for twisted-pair).
  • Key Aspects: Ensures signal integrity, proper separation from high-voltage lines, and compliance for plenum or direct-burial-rated cables. Voluntary unless mandated by local codes.

IEEE 835 (Standard Power Cable Ampacity Tables)

  • Relevance: Provides ampacity ratings for underground power cables, critical for sizing conductors to prevent overheating.
  • Key Aspects: Includes data for direct-burial and ducted installations, considering soil thermal resistivity and ambient conditions. Often referenced alongside NEC for high-current applications.

UL 83 (Standard for Thermoplastic-Insulated Wires and Cables)

  • Relevance: Underwriters Laboratories standard for wires like THWN-2, commonly used in underground conduits. Ensures cables meet safety and performance criteria for wet locations.
  • Key Aspects: Specifies insulation durability, temperature ratings, and suitability for direct burial or conduit use. NEC requires UL-listed cables for compliance.

OSHA 1910.305 (Wiring Methods, Components, and Equipment)

  • Relevance: U.S. Occupational Safety and Health Administration standard for workplace electrical safety, including underground installations in industrial settings.
  • Key Aspects: Specifies approved wiring methods (e.g., armored cable, conduit) and enclosure requirements for underground cable trays or boxes. Focuses on worker safety during installation and maintenance.

CSA C22.1 (Canadian Electrical Code)

  • Relevance: Canada’s equivalent to the NEC, governing underground electrical installations. Similar to NEC but tailored to Canadian conditions and regulations.
  • Key Aspects: Defines burial depths, conduit types, and grounding requirements. For example, low-voltage cables (<30V) require 6-inch burial depth, like NEC.

Notes:

  • Regional Variations: Always consult local building authorities, as codes like the NEC or AS/NZS 3000 may have amendments. For example, some U.S. states reduce burial depths for GFCI-protected circuits (NEC 300.5).
  • Low-Voltage vs. High-Voltage: Standards like TIA-568 and ISO/IEC 11801 focus on low-voltage (e.g., <50V) telecommunications, while NEC and IEC 60364 cover both power and telecom.
  • Practical Compliance: Before installation, call 811 (U.S.) or equivalent to locate underground utilities, and obtain permits/inspections as required by local codes.
  • Critical Examination: While these standards are authoritative, they can lag behind technological advancements (e.g., new cable types like GameChanger exceeding TIA-568 limits). Over-reliance on minimum requirements may limit performance for cutting-edge applications.

Underground Electrotechnology General Conditions and Standard Details

Related:

1793-2012 – IEEE Guide for Planning and Designing Transition Facilities between Overhead and Underground Transmission Lines

The effect of an underground to overhead transition point on the specification of sheath voltage limiters in underground networks

Channel Characteristics Analysis of Medium Voltage Overhead and Mixed Overhead/Underground Cable Power Network

P81/D4, Jan 2025 – IEEE Draft Guide for Measuring Earth Resistivity, Ground Impedance, and Earth Surface Potentials of a Grounding System

Johann Sebastian Bach: Brandenburg Concerto No. 3 in G Major

June 10, 2025
mike@standardsmichigan.com

No Comments


 

Cambridge Center for Smart Infrastructure & Construction

June 10, 2025
mike@standardsmichigan.com
, , ,
No Comments

“No village or individual shall be compelled to make bridges at river banks,

except those who from of old are legally bound to do so.”

— Magna Cara Clause 23 (Limiting forced labor for infrastructure) 

“Clare Hall and King’s College Chapel, Cambridge, from the Banks of the River Cam” / Joseph Mallord William Turner (1793)

 

Smart Infrastructure: Getting More From Strategic Assets

Dr Jennifer Schooling, Director of CSIC

Dr Ajith Parlikad, CSIC Co-Investigator and Senior Lecturer

Mark Enzer, Global Water Sector Leader

Mott MacDonald; Keith Bowers, Principal Tunnel Engineer, London Underground

Ross Dentten, Asset Information and Configuration Manager, Crossrail

Matt Edwards, Asset Maintenance and Information Manager, Anglian Water Services

Jerry England, Group Digital Railway Director, Network Rail

Volker Buscher, Director, Arup Digital

 

Smart Infrastructure is a global opportunity worth £2trn-4.8trn. The world is experiencing a fourth industrial revolution due to the rapid development of technologies and digital abundance.

Smart Infrastructure involves applying this to economic infrastructure for the benefit of all stakeholders. It will allow owners and operators to get more out of what they already have, increasing capacity, efficiency and resilience and improving services.

It brings better performance at lower cost. Gaining more from existing assets is the key to enhancing service provision despite constrained finance and growing resource scarcity. It will often be more cost-effective to add to the overall value of mature infrastructure via digital enhancements than by physical enhancements – physical enhancements add `more of the same’, whereas digital enhancements can transform the existing as well.

Smart Infrastructure will shape a better future. Greater understanding of the performance of our infrastructure will allow new infrastructure to be designed and delivered more efficiently and to provide better whole-life value.

Data is the key – the ownership of it and the ability to understand and act on it. Industry, organisations and professionals need to be ready to adjust in order to take advantage of the emerging opportunities. Early adopters stand to gain the most benefit. Everyone in the infrastructure sector has a choice as to how fast they respond to the changes that Smart Infrastructure will bring. But everyone will be affected.

Change is inevitable. Progress is optional. Now is the time for the infrastructure industry to choose to be Smart.

 

LEARN MORE:

Cambridge Centre for Smart Infrastructure and Construction


Perspective: Since this paper is general in its recommendations, we provide examples of specific campus infrastructure data points that are difficult, if not impossible, to identify and “make smart” — either willfully, for lack of funding, for lack of consensus, for lack of understanding or leadership:

    1. Maintenance of the digital location of fire dampers in legacy buildings or even new buildings mapped with BIM.  Doors and ceiling plenums are continually being modified and the As-Built information is usually not accurate.  This leads to fire hazard and complicates air flow and assuring occupant temperature preferences (i.e. uncontrollable hot and cold spots) 
    2. Ampere readings of feeder breakers downstream from the electric service main.  The power chain between the service substation and the end-use equipment is a “no-man’s land” in research facilities that everyone wants to meter but few ever recover the cost of the additional metering.
    3. Optimal air flow rates in hospitals and commercial kitchens that satisfies both environmental air hazards and compartmentalized air pressure zones for fire safety.
    4. Identification of students, staff and faculty directly affiliated with the campus versus visitors to the campus.
    5. Standpipe pressure variations in municipal water systems
    6. Pinch points in municipal sewer systems in order to avoid building flooding.
    7. How much of university data center cost should be a shared (gateway) cost, and how much should be charged to individual academic and business units?
    8. Should “net-zero” energy buildings be charged for power generated at the university central heating and electric generation plant?
    9. How much staff parking should be allocated to academic faculty versus staff that supports the healthcare delivery enterprises; which in many cases provides more revenue to the university than the academic units?
    10. Finally, a classical conundrum in facility management spreadsheets: Can we distinguish between maintenance cost (which should be covered under an O&M budget) and capital improvement cost (which can be financed by investors)

 

 

Telecommunications Service Point

June 10, 2025
mike@standardsmichigan.com
No Comments

Today we get down in the weeds to examine the point of common coupling between a building and a telecommunication service provider.

Education facilities often require a more diverse approach to designing and implementing ICT systems than that of a typical commercial building.  First of all, educational settlements are frequently one building. That means not only does the ICT infrastructure need to meet the varying demands of a specific building, but multiple buildings must all be integrated into one cohesive design.

In an environment of providing multifunctional spaces within one building, it is common to find a combination of commercial, industrial, data center, health care and entertainment environments within just a few buildings; hence our preference for the word “settlements” over the more widely used word “campus”.

TIA Standards

ANSI/TIA-568-C series: Telecommunications Cabling Standards.  Specifies the requirements for various aspects of structured cabling systems, including cabling components, installation, and testing.

TIA-569-B: Telecommunications Pathways and Spaces.  Provides guidelines for the design and installation of pathways and spaces for telecommunications cabling.

TIA-606-B: Administration Standard for Commercial Telecommunications Infrastructure.  Specifies administration practices for the telecommunications infrastructure of commercial buildings.

Our inquiry cuts across the catalogs of several other standards developers:

NEC (National Electrical Code).  NEC Article 800 specifically addresses the installation of communications circuits and equipment.

ISO/IEC 11801: Information technology — Generic cabling for customer premises.  Defines generic telecommunications cabling systems (structured cabling) used for various services, including voice and data.

IEEE 802.3: Ethernet Standards. Defines standards for Ethernet networks, which are commonly used for data communication in buildings.

UL 497: Protectors for Paired Conductor Communications Circuits. Addresses requirements for protectors used to safeguard communications circuits from overvoltage events.

GR-1089-CORE: Electromagnetic Compatibility and Electrical Safety. Published by Telcordia (now part of Ericsson), this standard provides requirements for the electromagnetic compatibility and electrical safety of telecommunications equipment.

FCC Part 68: Connection of Terminal Equipment to the Telephone Network. Outlines the technical requirements for connecting terminal equipment to the public switched telephone network in the United States.

Local building codes and regulations also include requirements for the installation of telecommunication service equipment.


Last update: October 12, 2019

All school districts, colleges, universities and university-affiliated health care systems have significant product, system, firmware and labor resources allocated toward ICT.   Risk management departments are attentive to cybersecurity issues.   All school districts, colleges, universities and university-affiliated health care systems have significant product, system, firmware and labor resources allocated toward ICT.

The Building Industry Consulting Service International (BICSI) is a professional association supporting the advancement of the ICT community.   This community is roughly divided between experts who deal with “outside-plant” systems and “building premise” systems on either side of the ICT demarcation point.   BICSI standards cover the wired and wireless spectrum of voice, data, electronic safety & security, project management and audio & video technologies.  Its work is divided among several committees:

BICSI Standards Program Technical Subcommittees

BICSI International Standards Program

BICSI has released for public review a new consensus document that supports education industry ICT enterprises:  BICSI N1 – Installation Practices for Telecommunications and ICT Cabling and Related Cabling Infrastructure.    You may obtain a free electronic copy from: standards@bicsi.org; Jeff Silveira, (813) 903-4712, jsilveira@bicsi.org.

Comments are due November 19th.

 

You may send comments directly to Jeff (with copy to psa@ansi.org).   This commenting opportunity will be referred to IEEE SCC-18 and the IEEE Education & Healthcare Facilities Committee which meets 4 times monthly in American and European time zones and will meet today.  CLICK HERE for login information.

Issue: [18-191]

Category: Telecommunications, Electrical, #SmartCampus

Colleagues: Mike Anthony, Jim Harvey, Michael Hiler

Readings:

What is Grounding and Bonding for Telecommunication Systems?

 

 


Adhiyamaan College of Engineering

 

 

 

 

 

 

 

 

Information & Communication Technology Cabling

June 10, 2025
mike@standardsmichigan.com
,
No Comments

Balloting on the first stage of development of the 2023 National Electrical Code is underway now and will be completed by March 26th.  We collaborate with several experts in the IEEE who are the leading voices in standards setting for ICT infrastructure present in education communities.  The issues are  many and complex and fast-moving.   We provide transcripts and a sample of the issues that will determine the substance of the 2023 Edition.

Code Making Panel No. 3 Public Input Report

A sample of concepts in play:

Temperature limitations of Class 2 and Class 3 Cables

Fire resistive cabling systems

Multi-voltage (single junction, entry, pathway or connection) signaling control relay equipment

Listing of audio/video power-limited circuits

Code Making Panel No. 16 Public Input Report

A sample of concepts in play:

Definition of “Communication Utility”

Mechanical execution of work

Listed/Unlisted cables entering buildings

Underground communication cabling coordination with the National Electrical Safety Code

Public comment on the First Draft of the 2026 revision will be received until August 24, 2024.  We collaborate with the IEEE Education & Healthcare Facilities Committee which hosts open colloquia 4 times monthly in European and American time zones.   See our CALENDAR for the next online meeting; open to everyone.

"One day ladies will take their computers for walks in the park and tell each other, "My little computer said such a funny thing this morning" - Alan Turing

Layout mode
Predefined Skins
Custom Colors
Choose your skin color
Patterns Background
Images Background
error: Content is protected !!
Skip to content