Entertainment Occupancies

Loading
loading...

Entertainment Occupancies

September 26, 2025
mike@standardsmichigan.com
,
No Comments

2025 GROUP B PROPOSED CHANGES TO THE I-CODES | Complete Monograph 2630 Pages

N.B.

G73-25 Section 410: Stages, Platforms and Technical Production Areas (Page 591-…) Submitted by the American Society of Theater Consultants

G77-25: Emergency ventilation  (Pages 601-…)

G27-25: Type A and B stage definition (Page 490)

G78-25: Technical Production areas (Page 602)

American Society of Theater Consultants | Oberlin College

2024 GROUP A PROPOSED CHANGES TO THE I-CODES | Complete Monograph 2658 Pages

2024/2025/2026 ICC CODE DEVELOPMENT SCHEDULE

“View from the Ancient Theater in Taormina to Mount Etna” c. 1880 Carl Wuttke

Safety and sustainability for any facility begins with an understanding of who shall occupy it.  University settings, with mixed-use phenomenon arising spontaneously and temporarily, present challenges and no less so in  square-footage identified as performing arts facilities.  Education communities present the largest installed base of mixed use and performing arts facilities.  A distinction is made between supervised occupants that are in secondary schools (generally under age 18) and unsupervised occupants that are in university facilities (generally above age 18).

First principles regarding occupancy classifications for performing arts facilities appear in Section 303 of the International Building Code Assembly Group A-1.  The public edition of the 2021 IBC is linked below:

2024 IBC Chapter 3: Occupancy Classification and Use


Each of the International Code Council code development groups A, B and C; fetch back to these classifications.   You can sample the safety concepts in play with an examination of the document linked below:

2019 GROUP B PROPOSED CHANGES TO THE GROUP B I-CODES

2019 GROUP B PUBLIC COMMENT AGENDA

Each of the foregoing documents are lengthy so we recommend using search terms such as “school”, “college”, ‘”university”, “auditorium”, “theater”, “children”, “student” to hasten your cut through it.

We find continuation of lowering of the lighting power densities as noteworthy.  Technical committees assembled and managed by the International Code Council, the American Society of Heating & Refrigeration Engineers and the Illumination Engineering Society are leaders in developing consensus products that drive the LED illumination transformation.

 

The revision schedule for the next tranche of ICC titles that are built upon the foundation of the IBC is linked below:

2024/2025/2026 ICC CODE DEVELOPMENT SCHEDULE

We encourage experts in education communities — facility managers, research and teaching staff, architectural and engineering students — to participate directly in the ICC Code Development process at the link below:

https://www.iccsafe.org/cdpaccess/

We reserve a place on the agenda of our standing Lively 200 colloquia on this topic.  See our CALENDAR for the next online meeting; open to everyone.

 

Issue: [18-166]

Category: Architectural, Healthcare Facilities, Facility Asset Management

Colleagues: Mike Anthony, Jim Harvey, Richard Robben


The International Code Council (ICC) develops its codes and standards through a consensus-driven process. The ICC Code Development Process follows these major stages:

Code Change Proposal Submission

Stakeholders (e.g., government officials, industry professionals, and the public) submit proposals to modify existing codes or introduce new provisions.

Committee Action Hearing (CAH)

Expert committees review and evaluate submitted proposals.
Public testimony is allowed, and committees vote on whether to approve, disapprove, or modify the proposals.

Public Comment Period

After the CAH, the public can submit comments or suggest modifications to the committee’s decisions.
These comments help refine the proposed changes before final voting.

Public Comment Hearing (PCH)

ICC members discuss and vote on public comments.
This step ensures that all voices are heard and debated before finalizing changes.

Online Governmental Consensus Vote (OGCV)

Governmental members vote on the final code changes electronically.
Only governmental voting members (e.g., code officials) participate in this stage to ensure the process remains unbiased.

Publication of New Code Edition

Approved code changes are incorporated into the next edition of the ICC codes.
The ICC updates its codes every three years (e.g., 2021, 2024, 2027 editions).

This structured process ensures that ICC codes remain comprehensive, up-to-date, and responsive to industry needs while maintaining safety and functionality.

Audio Standards

September 26, 2025
mike@standardsmichigan.com
,
No Comments

“A Dance to the Music of Time” 1640 Nicolas Poussin

 

 

“The voice of the intellect is a soft one,

but it does not rest until it has gained a hearing.”

— Sigmund Freud

 

The education industry provides a large market for occupancy classes — athletic stadiums, student assembly spaces, performance theaters, large lecture halls– that depend upon effective audio systems*.   To an unexpected degree the structural engineering, specification of materials and electrical system design and operation is informed by acoustical considerations.  So does the integration of fire safety and mass notification systems into normal state enterprises so it is wise to follow and, ideally, participate in leading practice discovery and promulgation of audio standards.

The Audio Engineering Society — one of the first names in this space — has a due process platform that welcomes public participation.   All of its standards open for public comment completed their revision cycle mid-November as can be seen on its standards development landing page below:

AES Standards Development

Note that AES permits access to those revision even after the comment deadline.  You are encouraged to communicate directly with the Direct communication with the standards staff at Audio Engineering Society International Headquarters, 551 Fifth Avenue, Suite 1225, New York NY 10176,  Tel: +1 212 661 8528

We keep the AES suite on the standing agenda of our periodic Lively Arts teleconference.  See our CALENDAR for the next online meeting.

This facility class is one of most complex occupancy classes in education facilities industry so we also collaborate with experts active in the IEEE Education & Healthcare Facilities Committee. Much of the AES suite references, and borrows from, International Electrotechnical Commission system integration and interoperability standards.   The IEEE E&H committee meets online again four times monthly in European and American time zones.  The meeting dates are available on the IEEE E&H website

Media production audio visual

Issue: [19-23]

Category: Electrical, Academic,  Athletics, Fire Safety, Public Safety, #WiseCampus

Contact: Mike Anthony, Jim Harvey

*Mass notification systems are governed by NFPA 72 and, while life safety wiring is separate from other wiring, the management of these systems involve coordination between workgroups with different business objectives and training.


LEARN MORE:

Archive / Audio Engineering Society

 

Eagles’ Nest

September 25, 2025
mike@standardsmichigan.com

No Comments

This content is accessible to paid subscribers. To view it please enter your password below or send mike@standardsmichigan.com a request for subscription details.

Fire Alarm & Signaling Code

September 25, 2025
mike@standardsmichigan.com

No Comments

“Prometheus Bound” | Thomas Cole (1847)

NFPA 72 National Fire Alarm and Signaling Code is one of the core National Fire Protection Association titles widely incorporated by reference into public safety legislation.   NFPA 72 competes with titles of “similar” scope — International Fire Code — developed by the International Code Council.  We place air quotes around the word similar because there are gaps and overlaps depending upon whether or not each is adopted partially or whole cloth by the tens of thousands of jurisdictions that need both.

Our contact with NFPA 72 dates back to the early 2000’s when the original University of Michigan advocacy enterprise began challenging the prescriptive requirements for inspection, testing and maintenance (IT&M) in Chapter 14.  There are hundreds of fire alarm shops, and thousands of licensed fire alarm technicians in the education facility industry and the managers of this cadre of experts needed leadership in supporting their lower #TotalCostofOwnership agenda with “code-writing and vote-getting”.   There was no education industry trade association that was even interested, much less effective, in this space so we had to do “code writing and vote getting” ourselves (See ABOUT).

Code writing and vote getting means that you gather data, develop relationships with like minded user-interests, find agreement where you can, then write proposals and defend them at NFPA 72 technical committee meetings for 3 to 6 years.  Prevailing in the Sturm und Drang of code development for 3 to 6 years should be within the means of business units of colleges and universities that have been in existence for 100’s of years.  The real assets under the stewardship of these business units are among the most valuable real assets on earth.

Consider the standard of care for inspection, testing and maintenance.  Our cross-cutting experience in over 100 standards suites allows us to say with some authority that, at best the IT&M tables of NFPA 72 Chapter 14 present easily enforceable criteria for IT&M of fire alarm and signaling systems.  At worst, Chapter 14 is a solid example of market-making by incumbent interests as the US standards system allows.   Many of the IT&M requirements can be modified for a reliability, or risk-informed centered maintenance program but fire and security shops in the education industry are afraid to apply performance standards because of risk exposure.   This condition is made more difficult in large universities that have their own maintenance and enforcement staff.  The technicians see opportunities to reduce IT&M frequencies — thereby saving costs for the academic unit facility managers — the enforcement/compliance/conformity/risk management professionals prohibit the application of performance standards.  They want prescriptive standards for bright line criteria to make their work easier to measure.

While we have historically focused on Chapter 14 we have since expanded our interest into communication technologies within buildings since technicians and public safety personnel depend upon them.  Content in Annex G — Guidelines for Emergency Communication Strategies for Buildings and Campuses — is a solid starting point and reflects of our presence when the guidance first appeared in the 2016 Edition.  We shall start with a review of the most recent transcript of the NFPA Technical Committee on Testing and Maintenance of Fire Alarm and Signaling Systems

NFPA 72 First Draft Meeting (A2024)

Public Emergency Reporting Systems (SIG-PRS) First Draft

Public comment of the First Draft of the 2025 Edition is receivable until May 31, 2023.   As always, we encourage direct participation in the NFPA process by workpoint experts with experience, data and even strong opinions about shortcomings and waste in this discipline.  You may key in your proposals on the NFPA public input facility linked below:

https://www.nfpa.org/login

You will need to set up a (free) NFPA TerraView account.   Alternatively, you may join us any day at 11 AM US Eastern time or during our Prometheus or Radio colloquia.   See our CALENDAR for the online meeting.

Issue: [15-213]

Category: Fire Safety & Security, #SmartCampus, Informatics

Colleagues: Mike Anthony, Joe DeRosier, Josh Elvove, Jim Harvey, Marcelo Hirschler


More

2013 NFPA 72 National Fire Alarm and Signaling Code (357 pages)

TIA-222 Standard For Towers And Antenna Supporting Structures

 

Emergency Communication Strategies for Buildings

 

ARCHIVE / NFPA 72

National Center for Spectator Sports Safety and Security

 

Wood-Fired Pizza

September 24, 2025
mike@standardsmichigan.com
, , , ,
No Comments

Dickinson College Financial Statement 2022: $873.4M

Dickinson College | Cumberland County Pennsylvania

Every week, patrons of Farmers on the Square can count on locating the Dickinson College Farm’s wood-fired pizza oven right at the heart of the square. Our handmade and fresh-baked pizzas reflect the seasonal fluctuations on our farm in addition to quality ingredients grown within the Cumberland Valley. In addition to wood-fired pizzas, our stand features seasonal organic vegetables, fresh salad dressings, refreshing popsicles and “our farm in a jar” through canned soups, pickled favorites, salsa, hot sauce and more!”

Home Page

Pennsylvania

Home Economics

September 24, 2025
mike@standardsmichigan.com

No Comments

Today at the usual hour we review the standards, codes, regulations and best practice literature for the safety and sustainability of facilities for teaching skills needed for supporting families.

Inglenook

Salutariness | Fashion

Commercial Kitchens

Life Safety Code

Electrical Safety

Energy Standard for *Sites* and Buildings

Current Issues and Recent Research

What the University of Michigan has done to reduce the life cycle cost of the real assets of educational settlements in the USA

What is Happening to the Family, and Why?

International Plumbing Code

September 24, 2025
mike@standardsmichigan.com

No Comments

The International Plumbing Code (IPC) is developed to harmonize with the full span of ICC’s family of building codes.  The IPC sets minimum regulations for plumbing systems and components to protect life, health and safety of building occupants and the public. The IPC is available for adoption by jurisdictions ranging from states to towns, and is currently adopted on the state or local level in 35 states in the U.S, the District of Columbia, Guam, and Puerto Rico.

CLICK HERE for the 2021 Public Access Edition 

SOURCE: CLICK ON IMAGE | Contact ICC for most recent IPC adoption map

 

The IPC is developed in the ICC Group A Code development framework and concluded its revision cycle in late 2021 under the circumstances of the pandemic.  The 2023 International Plumbing Code revision cycle will not begin until early 2023 but it is never too soon to understand the issues from previous revision cycles to enlighten approaches to the forthcoming Group A revision cycle.   The complete monograph of the Group A Codes is linked below, with comments on IPC proposals starting on Page 1417 of this 1613 page document:

2021 IPC | Group A Public Comment Monograph

Because transgender issues are on the agenda of many facility managers we direct you to Page 1424 of the rather large document linked above.

As always, we persist in encouraging education industry facility managers (especially those with operations and maintenance data) to participate in the ICC code development process.  You may do so by CLICKING HERE.

Real asset managers for school districts, colleges, universities and technical schools in the Las Vegas region should take advantage of the opportunity to observe the ICC code-development process during the upcoming ICC Annual Conference in Las Vegas, October 20-23 during which time the Group B c Public Comment Hearings will take place.  Even though the IPC has moved farther along the ICC code development process it is still enlightening to observe how it work.   The Group B Hearings are usually webcast — and we will signal the link to the webcast when it becomes available — but the experience of seeing how building codes are determined is enlightening when you can watch it live and on site.

Issue: [16-133]

Category: Plumbing, Water, Mechanical

Colleagues: Eric Albert, Richard Robben, Larry Spielvogel

#StandardsNewMexico

 


LEARN MORE:

Neutral Public Bathroom Design

Uniform Plumbing Code

September 24, 2025
mike@standardsmichigan.com
,
No Comments

“Niagara” 1857 Frederic Edwin Church

Although the 2024 Revision is substantially complete there are a number of technical and administrative issues to be resolved before the final version is released for public use. Free access to the most recent edition is linked below.

CODE DEVELOPMENT

2027 UPC/UMC CODE DEVELOPMENT TIMELINE

Report on Comments for the 2024 Uniform Plumbing Code

Layout mode
Predefined Skins
Custom Colors
Choose your skin color
Patterns Background
Images Background
error: Content is protected !!
Skip to content