Radio 300

Loading
loading...

Radio 300

January 23, 2026
mike@standardsmichigan.com

No Comments

“The wireless age has brought us closer together,

yet we must work to ensure that it does not divide us.”

— Guglielmo Marconi

“Mathematical Theory of Electrodynamic Phenomena, Uniquely Deduced from Experience.” 1820 André-Marie Ampère

 

When the electric grid and the internet are down and there is no cell service, radio can still work to help communities stabilize.   Starting 2024 we will break down our coverage of the radio frequency technology standards used in educational settlements into into two categories:

Radio 300: Security and maintenance radio.  These usually use a single radio channel and operate in a half-duplex mode: only one user on the channel can transmit at a time, so users in a user group must take turns talking. The radio is normally in receive mode so the user can hear all other transmissions on the channel. When the user wants to talk he presses a “push-to-talk” button, which turns off the receiver and turns on the transmitter; when he releases the button the receiver is activated again. Multiple channels are provided so separate user groups can communicate in the same area without interfering with each other.

Note that a core title in this domain — NFPA 1802 Standard on Two-Way, Portable RF Voice Communications Devices for Use by Emergency Services Personnel in the Hazard Zone — is part of an NFPA catalog reorganization.  Best practice content will be rolled into NFPA 1300 Standard on Fire and Emergency Service Use of Thermal Imagers, Two-Way Portable RF Voice Communication Devices, Ground Ladders, and Fire Hose, and Fire Hose Appliances.  

As of this posting APCO International has no public consultations on any titles in its public safety radio standards catalog.  (Association of Public Safety Communications Officials Standards Catalog)

Shawnee Mission West High School

The IT Law Wiki: Spectrum Allocation

Radio 400: Student radio.  College radio stations are typically considered to be public radio radio stations in the way that they are funded by donation and grants.  The term “Public radio” generally refers to classical music, jazz, and news. A more accurate term is community radio, as most staff are volunteers, although many radio stations limit staff to current or recent students instead of anyone from the local community.  There has been a fair amount of drama over student-run radio station history; a topic we steer away from.

The Low Power FM radio service was created by the Commission in January 2000.  LPFM stations are authorized for noncommercial educational broadcasting only (no commercial operation) and operate with an effective radiated power (ERP) of 100 watts (0.1 kilowatts) or less, with maximum facilities of 100 watts ERP at 30 meters (100 feet) antenna height above average terrain.  The approximate service range of a 100 watt LPFM station is 5.6 kilometers (3.5 miles radius).  LPFM stations are not protected from interference that may be received from other classes of FM stations.

We follow — but do not respond — to consultations on titles covering the use of radio frequencies for the Internet of Things.  At the moment, most of that evolution happens at the consumer product level; though it is wise to contemplate the use of the electromagnetic spectrum during widespread and extended loss of broadband services.

Maxwell equations: Four lines that provide a complete description of light, electricity and magnetism

We do not include policy specifics regarding the migration of National Public Radio beyond cultural content into political news; though we acknowledge that the growth of publicly financed radio domiciled in education communities is a consideration in the technology of content preparation informed by the Public Broadcasting Act of 1967.

Sacred Heart University / Campus Public Safety & National Public Radio Studios / SGA Architects

We drill into technical specifics of the following:

  • Radios used for campus public safety and campus maintenance
  • Student-run campus radio stations licensed by the Federal Communications Commission as Low Power FM (LPFM)
  • Facilities for regional broadcast of National Public Radio operating from education communities
  • Off-campus transmission facilities such as broadcast towers.
  • Grounding, bonding, lightning protection of transmission and receiving equipment on buildings
  • Broadcast studio electrotechnologies

Radio technology is regulated by the Federal Communications Commission with no ANSI-accredited standards setting organizations involved in leading practice discovery and promulgation.  Again, we do not cover creative and content issues.  Join us today at 11 AM/ET using the login credentials at the upper right of our home page.


More

List of campus radio stations

International Telecommunications Union: News Magazine No.1 2022

International Electrotechnical Commission TC 103: Transmitting and receiving equipment for radiocommunications

International Special Committee on Radio Interference

NFPA 1802: Standard on Two-Way, Portable RF Voice Communications Devices for Use by Emergency Services Personnel in the Hazard Zone

Campus Safety Radio JVCKENWOOD CAMPUS SAFETY 5 TIPS TO LOWER COSTS

Discussion: College Town Drive Time Radio OR “A Half Truth is a Full Lie”

Radio Transmission Power & Frequency Allocation

Global Positioning System: A Generation of Service to the World

LIVE: KAFA 97.7 FM | THE ACADEMY

January 23, 2026
mike@standardsmichigan.com
, , , , , ,
No Comments

Broadcast Club • United States Air Force Academy

 

Radio Spectrum for the Internet of Things

January 23, 2026
mike@standardsmichigan.com
,
No Comments

“Wireless Telegraphy” 1899|Guglielmo Marconi

 

Analysis of the FM Radio Spectrum for Secondary Licensing of Low-Power Short-Range Cognitive Internet of Things Devices

Derek T. OtermatIvica KostanicCarlos E. Otero

Electrical and Computer Engineering Department, Florida Institute of Technology

 

Abstract. The analysis presented in this paper indicates that the FM radio spectrum is underutilized in the areas of the continental United States that have a population of 100000 or less. These locations have vacant FM radio spectrum of at least 13 MHz with sufficient spectrum spacing between adjacent FM radio channels. The spectrum spacing provides the required bandwidth for data transmission and provides enough bandwidth to minimize interference introduced by neighboring predicted and unpredicted FM radio stations and other low-power short-range Internet of Thing (IoT) devices. To ensure that low-power short-range IoT devices maintain reliable communications vacant radio spectrum, such as the FM radio spectrum in these areas, will need to be used through cognitive radio.

CLICK HERE to order complete paper.

Related:

Northwestern University: Internet of Things and Edge Computing

Duke University: Edge Computing

National Institutes of Health: Design of Edge Computing Online Classroom Based on College English Teaching

Renovation Standards

January 22, 2026
mike@standardsmichigan.com
No Comments

The key standards distinguishing building renovations (alterations, repairs, or rehabilitation) from new building construction primarily come from the model code stacks of the International Code Council, the National Fire Protection Association, ASHRAE International, Institute of Electrical and Electronic Engineers and the embedded product standards by ASTM International, Underwriters Laboratories and others we track routinely.

There are others, notably the FEMA “50 percent” rule informed by National Flood Insurance Program regulation applying to buildings in flood-prone areas. It governs renovation, repair, and improvement projects by defining “substantial improvement” or “substantial damage” as any work where costs equal or exceed 50% of the structure’s pre-improvement (or pre-damage) market value (excluding land value).

The “50 percent” rule does not exist in the Americans with Disabilities Act (ADA) regulations in the same way as FEMA’s flood-related 50% threshold for substantial improvement/damage. Instead, ADA alterations (under Title III for public accommodations and commercial facilities, and Title II for public entities) use a 20% disproportionate cost threshold for certain requirements.  
 
 
Sustainability objectives also shape the
scope of building renovation projects by expanding beyond basic repairs or cosmetic updates to encompass holistic, long-term performance improvements across environmental, economic, and social dimensions.  

 
 
Today at the usual hour we will scan stabilized standards and track changes in process where possible.  Use the login credentials at the upper right of our home page.

 

Pennsylvania School Building Standards

January 22, 2026
mike@standardsmichigan.com
No Comments

 

Pennsylvania School Building Code | Standards Pennsylvania

Uniform Construction Code

Pennsylvania’s school building codes are an adaptation of the stack developed by the International Code Council.  The most recent update includes enhanced requirements for safety (e.g., emergency escape paths, smoke alarms, surge protection), structural design (e.g., decks, snow loads), and energy efficiency, applying to new school construction, additions, and major renovations. 

Key supporting regulations include:

22 Pa. Code Chapter 21 (School Buildings): Covers planning, approval processes, and requirements for public school construction/reconstruction.

22 Pa. Code Chapter 349 (School Building Standards): Details space allocations, construction standards, and related rules.

Integrated Planning Glossary

January 22, 2026
mike@standardsmichigan.com

No Comments
§

Attendees of the SCUP 2025 North Atlantic Symposium sit on the Commons in Columbia Business School and smile.

The Society of College and University Planning was founded in 1965 at the University of Michigan in Ann Arbor during an informal gathering of campus planners frustrated with the lack of professional exchange in their emerging field. Rapid postwar enrollment growth and massive campus expansion projects had created urgent needs for long-range physical planning, yet few institutions had dedicated planners or shared knowledge.
A small group, led by University of Michigan planners George J. Bruha and Frederick W Mayer met in Ann Arbor to discuss common challenges facing other State of Michigan settlements; joined by Stanford, Ohio State and the University of Illinois. They decided to create a formal organization to foster collaboration, research, and professional development. In 1966, with Michigan’s support, SCUP was officially established as a nonprofit with its first office on the Ann Arbor campus. Its founding principle—integrated planning linking academics, finances, and facilities—remains central today.

Integrated Planning Glossary


Early operations benefited from administrative support (aegis) provided by the University of Michigan, including office space and resources in Ann Arbor. This arrangement persisted until a financial crisis in the late 1970s (1976–1980), during which SCUP relocated to New York.

The decoupling—marking full operational and administrative independence from the University of Michigan—occurred in 1980, when SCUP returned to Ann Arbor as a self-sustaining nonprofit headquartered at a separate location –1330 Eisenhower Place — less than a mile walk from Standards Michigan‘s front door at 455 East Eisenhower.

* Of the 220 ANSI Accredited Standards Developers, the State of Michigan ranks 3rd in the ranking of U.S. states with the most ANSI-accredited standards developers (ASDs) headquartered there; behind the Regulatory Hegemons of California and ChicagoLand and excluding the expected cluster foxtrot of non-profits domiciled in the Washington-New York Deep State Megalopolis.  Much of Michigan’s presence in the private consensus standards space originates from its industrial ascendency through most of the 1900’s.

Michigan Electrical Administrative Act §338.883

January 22, 2026
mike@standardsmichigan.com
,
No Comments

The requirement for a licensed electrician and a certified inspector to perform and certify any electrical work above $100 is prohibitive for homeowners and facility managers. To the best of our knowledge, no other US state imposes this requirement. There are more efficacious approaches to supporting effective public electrical safety services.

Licensing and Regulatory Affairs | Electrical Administrative Board

Next Meeting: February 5, 2026 10:00 am

Meeting Minutes: May 2, 2024 

Meeting Minutes: August 8, 2024 (not yet available)

Meeting Minutes: October 31, 2024 (submittals for agenda items due September 26th)

Related:

Michigan Public Service Commission

MPSC takes next steps in enabling interconnection and distributed energy resources

Of considerable importance is the criteria set by this board to determine whether a journeyman electrician is permitted to practice his or her trade in the State of Michigan.

We have been advocating for changes to the State of Michigan Electrical Administrative Act that currently requires all electrical work valued above $100 to be installed by a licensed journeyman electrician and inspected by an accredited electrical inspector.    The $100 threshold was set decades ago and has never been challenged by another other advocacy enterprise representing the user interest.  Almost all of the stakeholders on the present Electrical Administrative Board are stakeholders who benefit economically from the $100 threshold.    Much of the reason for the apparent imbalance of interests lies in tradition; but also because no user interest has been present to advocate for an update of the formal, fee schedule.

This advocacy priority was on the Do-List of the original University of Michigan codes and standards advocacy enterprise which was focused on strengthening the voice of the user/owner/final fiduciary in the promulgation of regulations affecting Michigan educational facilities (CLICK HERE for link to the legacy Advocacy Project 14-1).   Of all the trades covered in the parent legislation — Stille-Derossett-Hale Single State Construction Code Act (Act 230 of 1972) — the electrical power discipline is the only discipline in Michigan building technology regulations that sets a dollar criteria for electrical work to be performed and inspected.   While we recognize the need for safe installation of the electrical power chain within a building; we propose another criteria for establishing the requirement for a licensed electrician and a licensed inspector should be determined (as it is in all other construction disciplines administered by the Bureau of Construction Codes, a division of the Department of Licensing and Regulatory Affairs).

The actual text of the present regulation is available by clicking here:   338.881 Definitions | Electrical Administrative Act 217 of 1956

Father Marquette

As a consequence of former Governor Snyder’s Office of Regulatory Reinvention significant changes to both the Bureau of Construction Codes, a division of the Department of Licensing and Regulatory Affairs) have taken place within the past twelve months; which make us optimistic about political support for our proposals.   We will be collaborating with our colleagues at Michigan State University to make necessary legislative changes we believe will lower the #TotalCostofOwnership of education facilities in the State of Michigan.

We will refer the Michigan Electric Code, and other state electrical codes to the IEEE Education and Healthcare Facilities Committee which hosts bi-weekly breakout teleconferences with electrical professionals in the education facilities industry as required by the demand for them.

Electrical Administrative Board Responsibilities and Meeting Schedule

The next meeting of the Michigan Electrical Board is November 2nd.   We have been attending the meetings in Lansing and have made our proposal to revisit the dollar criteria known to the entire board.  We hope the Electrical Administrative Board will develop another criteria; inspired by the electrical administrative boards of other states.

Issue: [14-1]

Contact: Mike Anthony, Jack Janveja, Richard Robben, Kane Howard

Category: Electrical, State & Local Legislation

Link to Issue 14-1 Legacy Website


LEARN MORE:

Wide Variations in State Adoptions of the NEC® Reveal Neglect of Electrical Safety

 

 

Layout mode
Predefined Skins
Custom Colors
Choose your skin color
Patterns Background
Images Background
Standards Michigan
error: Content is protected !!
Skip to content